client:
Future Breaks Co.
Terms:
6 month
project type:
28 Villa
Strategy:
Minimalistic
date:
March 22, 2022

Work was done on glass facades, windows, doors, and skylights using Italian-made accessories.

One of the challenges that we faced is the site’s readiness, as there are other works that are taking place at the same time we were working with. However, it was completed on time with the assurance of quality control and everything.